Results

This page reports the results achieved for the proposed EA to solve the HCSP. The tables show the avergare and best cost values as well as execution time of the proposed EA, and a comparison with the BAB deterministic method and lower bounds computed for the problem.

 

Results

Instances from Akkan et al.

Results

 

DPPM

Deadline Problem in Project Management

DPPM results

Grid